A34 Highway Improvements in Stafford

The A34 corridor running through Stafford, Staffordshire, has undergone significant infrastructure enhancements in recent years to ease congestion, support regional housing development, and encourage sustainable transport. These highway improvements include the construction of major bypass connections, junction remodeling, modernized traffic signaling, resurfacing programs, and extensive new infrastructure for cyclists and pedestrians across both northern and southern stretches of the route.

Stafford Western Access Route (SWAR)

One of the most transformative projects linked to the corridor is the Stafford Western Access Route (St Martin’s Gate), which connects the A34 Foregate Street with the A518 Newport Road. Officially opened in 2022, this multi-million-pound bypass diverts east-west traffic away from Stafford town center and the congested Queensway stretch of the A34, significantly easing bottle-necks near the railway station and improving journey times across the urban network.

A34 North and Beaconside Capacity Enhancements

North of the town center, major junction remodelling has taken place where the A34 Stone Road intersects with Beaconside (A513). Improvements here were delivered to accommodate substantial commercial and residential growth in north Stafford. Works included:

  • Lane widening on key approaches to increase junction capacity.
  • Installation of intelligent, adaptive traffic signals to optimize vehicle throughput during peak commuting hours.
  • Realigned kerblines and upgraded pedestrian crossings to improve safety.

Active Travel and Cycling Infrastructure

Staffordshire County Council has implemented major active travel upgrades along the A34 corridor to improve safety for pedestrians and cyclists:

  • A34 North (Stone Road): High-quality, dedicated, and largely segregated cycleways have been installed running parallel to the carriageway, providing a direct, off-road link between northern residential estates, business parks, and the town center.
  • A34 South (Radford Bank): Kerb realignment, dedicated shared-use paths, and improved crossing facilities have been created along the southern gateway, closing critical gaps in the National Cycle Network and Stafford’s local cycling network.

Queensway and Gaol Square Upgrades

At the core of the A34 corridor, the Queensway dual carriageway and Gaol Square roundabout have received targeted operational upgrades. Work focused on optimizing lane layouts, refreshing anti-skid surfacing, and replacing outdated signal controllers with modern systems capable of responding dynamically to real-time traffic volumes.

Resurfacing and Drainage Improvements

To maintain structural resilience under heavy goods traffic, targeted sections of the A34—including the Radford Bank area, Queensway, and stretches toward Stone—have received comprehensive resurfacing, strengthened sub-base layers, and overhauled roadside drainage networks to prevent localized flooding and reduce ongoing maintenance disruption.